Energy Figures

How many batteries have gone into Roma 4455?

72

Installed since July 2025

Roma, Euthulla, Mount Abundance, Orange Hill, Tingun, Dargal Road, Eumamurrin, Gunnewin. Darling Downs - Maranoa, QLD

696 approved battery sellers serve QLD

Fig. 1 · Batteries installed, Roma 4455 · Source CER · 28 September 2026
Typical battery
28.1 kWh
Homes with solar, no battery (est.)
1,919
Solar systems since 2001
1,991
Homes (2021 Census)
3,786

Source CER · Monthly

Batteries installed each month

14
Batteries installed each month in Roma 4455. Rebate fell 1 May 2026.
Jul 20256
Aug 20253
Sep 20254
Oct 20254
Nov 20256
Dec 20256
Jan 20262
Feb 20264
Mar 202611
Apr 202614
May 20262
Jun 20264
Jul 20265
Aug 2026 (provisional)1

Federal and state

Rebate in QLD

Rebate by battery size
Usable capacityFederal rebateCertificates
10 kWhUp to $2,72068
15 kWhUp to $3,96099
25 kWhUp to $5,600140

Source CDR · Retail plans

Best plans for battery owners

Ergon

Highest feed-in

  1. 8.7c/kWh

    Origin Energy, Origin Standing

  2. 8.7c/kWh

    Origin Energy, Origin Standing

  3. 8.7c/kWh

    Origin Energy, Origin Standing

Widest peak to off-peak gap

  1. 48.9c / 8.1c

    Ergon Energy, Tariff 12F and Tariff 33

  2. 48.9c / 8.1c

    Ergon Energy, Tariff 12F with Tariff 31 and Tariff 33

  3. 48.9c / 8.1c

    Ergon Energy, Tariff 12F and Tariff 31

Questions

Where do the install numbers come from?

The Clean Energy Regulator's small-scale installation postcode data, which counts every battery that has claimed small-scale technology certificates since July 2025. August 2026 is provisional: installers have up to twelve months to claim, so the latest month always rises later.

How is 'homes with solar but no battery' estimated?

Every solar system installed in the postcode since 2001, minus batteries installed since July 2025, never below zero and never above the number of homes in the 2021 Census. It is an estimate: the solar count includes replaced and upgraded systems, and batteries installed before July 2025 are only published by state, not by postcode.

How is the federal rebate worked out?

The Cheaper Home Batteries Program pays small-scale technology certificates (STCs). A battery gets 6.8 certificates per kWh of usable capacity for the first 14 kWh, 60% of that from 14 to 28 kWh, and 15% from 28 to 50 kWh. The factor drops to 5.7 on 1 January 2027, so the same battery gets less after that date. The date on the battery's electrical safety certificate decides which factor applies, not the date you sign a contract. Your installer claims the certificates and takes their value off the price. The government clearing house pays $40 per certificate before GST, which is why each figure says "up to": certificates also trade on a market, usually for less. Rules checked 28 September 2026.

When does the rebate reminder arrive?

About a month before each drop in the federal rebate, starting with 1 January 2027: one email with what the rebate is worth before and after. You stay signed up for the next drop, and every email has a one-click unsubscribe.

Which states add their own rebate?

Western Australia pays Synergy customers $130 per kWh of usable capacity up to $1,300, and Horizon Power customers $380 per kWh up to $3,800, if the battery joins an eligible virtual power plant. New South Wales pays certificates for joining a virtual power plant, which your VPP provider buys at its own price, so no dollar figure is shown. South Australia has a virtual power plant offer for concession holders whose amounts we could not confirm from an official source, so it is not shown. Victoria, Queensland, Tasmania, the ACT and the Northern Territory have no household battery rebate open.

Where do the plans come from?

Every retailer publishes its current household electricity plans through the Consumer Data Right, hosted by the Australian Energy Regulator. Rates include GST where GST applies. Feed-in is the highest rate the plan pays for exported power; time-of-use shows the peak and off-peak usage rates. Check the plan's full terms with the retailer before switching.

Numbers as of 28 September 2026.